Forge collaboration for fm

SPINALCOM, using Forge technology, is addressing EDF's challenge by providing the FM team with a BMS Supervisor (control center) that contextualizes the data in their BIM model and intelligently filters alarms to save time on each alert, regardless of the silo it comes from. 

http://labs.blogs.com/its_alive_in_the_lab/2018/05/spinalcom-is-enabling-collaborative-real-time-bim-level-3-applications-for-all-stages-of-a-facilitys.html

Comments

Popular posts from this blog

Revit area plans adding new types and references (Gross and rentable)

Powerpoint countdown and current time in slides VBA

Revit 2019 and up tab colorizer